Customer issues:

  • The product must be checked manually before being fed into the machine.
  • One operator can operate only one machine

PMAPropose Solutions:

  • The automated measuring machine supplies about 450 units at a time.
  • One operator can manage 3–5 machines.
  • Operators do not need to stay in front of the machine.